Corrosion protection

Blasting: SA2,5 and SA3

Zinc dust priming

Hot dip galvanizing

Spray zinc application
 

Painting

We use water-based and solvent coats according to customer requirements and Norm DIN EN ISO 12944.

Our capacity and possibility of cooperation relates to the special equipment:

  • Painting chamber with newest painting technology internal dimensions 15 x 8 x 6 m,
  • Drying chamber with maximum temperature +60°C,
  • Painting and drying chamber for smaller parts, up to 2000 kg, with internal dimensions 13.5 x 6.7 x 3 m,
  • Manual carrying transporter for moving of parts from the painting chamber to the dryer – loading capacity - 2000 kg.
  • Crane capacity: 1 x 25 t, 1 x 25/10 t and 1 x 2.5 t